Sie sehen Ausschreibungen, deren Frist abgelaufen ist. Bestellen Sie einen kostenlosen Demozugang.
Titel
Drucken  
EIB - Technische Hilfe bei der Durchführung des Projekts „Malawi NRWB Water Efficiency Project“
Drucken  
VergabeverfahrenVerfahren zur Vor-Information
Dienstleistungsauftrag (VOL/VOF)
AuftraggeberContracting Authority European Investment Bank
boulevard Konrad Adenauer 98-100
2950 Luxembourg
AusführungsortLU-2950 Luxemburg
Frist26.09.2016
TED Nr.285994-2016
Beschreibung

000. Contracting Authority European Investment Bank

98-100, boulevard Konrad Adenauer

2950 Luxembourg


001. Reference code TA2016064 MW IF3


002. Procedure Restricted international tender


003. Programme Cotonou Partnership Agreement


004. Financing ACP-EU Investment Facility


005. Contracting Authority European Investment Bank 98-100, boulevard Konrad Adenauer 2950 Luxembourg


Internet: www.eib.org/about/procurement/calls-technical-assistance/ta2016064.htm


006. Nature of contract Fee-based


007. Contract description Northern Region Water Board (NRWB) is one of the five Water Boards of Malawi. The purpose of the TA operation is to provide assistance to NRWB in the areas of investment planning and implementation, non-revenue water reduction and operational and maintenance improvements, as well as to assess the potential for future investments in sanitation. The TA operation should cover both towns of Mzuzu and Ekwendeni. The TA Consultant will be responsible for ensuring that NRWB can achieve a number of targets by the completion of the contract including (i) review of detailed designs, (ii) development of efficient and effective well field pumping system, (iii) development of GIS and (iv) a hydraulic model, (v) design of the Supervisory Control And Data Acquisition (SCADA) and Management Information System (MIS), (vi) staff training on GIS, Hydraulic modelling and leak detection, (vii) reduction in non-revenue water to approximately 25% from the current 36%, (viii) satisfactory project procurement and (ix) project management and monitoring, (x) development of a sanitation project proposal, (xi) assessment of the potential of Lunyangwa Dam Raising and (xii) design of two river intakes. The expert team should be composed of a Team Leader, a Water Supply and Sanitation Expert, and various other engineering specialists according to needs. The operation is planned to be implemented in 36 months.


008. Indicative budget EUR 1,900,000


009. Intended timing of publication of the procurement notice September 2016


010. Additional information None


011. Legal basis ACP-EU Partnership Agreement signed in Cotonou on 23 June 2000 as amended in Luxembourg on 25 June 2005 and in Ouagadougou on 22 June 2010; Council Regulation (EU) 2015/322 of 2 March 2015 on the implementation of the 11 European Development Fund; and Council Regulation (EU) 2015/323 of 2 March 2015 on the financial regulation applicable to the 11th European Development Fund

VeröffentlichungGeonet Ausschreibung 136869 vom 19.08.2016